Skip to main content
Wide view of a landscaped outdoor living space

Free estimates, valley wide

Tell us what you picture out there

A rough idea is plenty to start with. Send a photo, describe the yard, or just tell us the problem, and we will take it from there.

The fastest ways to reach us

The form is the fastest way to reach us, and ownership reads it in person. Customers regularly get a same day reply, and we strive to get out for the visit the same day, or within 24 hours if it is not a weekend.

Email
info@salasconcrete.com

Attach photos and a rough idea of the square footage if you have it.

Form
Get a Free Estimate

Tell us the town and roughly what you have in mind. We will come back to arrange a walk through.

Hours

  • Monday to Friday, 9am to 5pm
  • Saturday and Sunday, by appointment only

Crews are usually on site well before 9am in summer, because pouring concrete at 105 degrees is a job you start early.

Get your free estimate

Tell us the town, roughly what you have in mind, and anything you already know about the space. We will come back to arrange a walk through.

What happens next

From this form to a finished yard

Seven steps, and the first three cost you nothing.

  1. Day 1

    Reach out

    Send the form and tell us roughly what you have in mind for the yard. You do not need a drawing or a finished idea, a rough sketch on your phone is plenty to start with.

  2. Day 1 to 3

    On site walk and 3D design

    We come out, walk the yard with you, talk through layout and finishes, and plan around how you actually use the space. We aim to make that visit the same day you call, or within 24 hours on weekdays. Before anything is built, we put together a 3D rendering of the design so you can see the finished yard and ask for changes while it is still just a drawing.

  3. Within days

    Free written estimate

    One clear written price, with no surprise line items later. If the finished job uses less footage than the allowance, that money comes back to you.

  4. Scheduled

    Demo and prep

    Old concrete comes out, roots and obstacles are dealt with, base and forms go in, and slope, joints and drains are set before anything is poured. Drainage is designed in, not fixed afterwards.

  5. Build week

    Build

    Pour, finish, and install the hardscape, turf, shade, fire and kitchen elements. Most single element jobs finish in a day. One 380 sq ft pour was done in under 9 hours ahead of forecast rain.

  6. Same day

    Clean up and walk through

    The site is cleared of debris before the crew leaves, and you walk the finished yard with us. One customer wrote that nobody would have known their house had been a construction zone for two days.

  7. After

    Cure and stand behind it

    Concrete is given the time it needs to cure properly, and we stay reachable. Customers come back years later for the next phase of the yard, which is the part we are proudest of.

Not sure whether we reach your town? The service area page lists every place we work and which trades reach each one.

Ready when you are

Send the form and you will get a straight answer about whether we are the right fit before anyone books a visit.

CallText UsFree Estimate